Bengaluru to get 10–15-year economic development roadmap, says CM D.K. Shivakumar
Karnataka Chief Minister D.K. Shivakumar chaired a Strategic Senior Advisory Group meeting on Monday to discuss a comprehensive long-term economic development plan for the Bengaluru Metropolitan Region (BMR).

The proposed roadmap, covering the next 10 to 15 years, is aimed at strengthening transportation, housing, water supply and industrial development across the metropolitan region.
The meeting was attended by Ministers M.B. Patil, Krishna Byre Gowda, Priyank Kharge and Byrathi Suresh, MP G.C. Chandrashekhar, senior government officials and industry representatives.
The plan is being aligned with Karnataka’s broader economic ambitions of reaching a $400–420 billion economy by 2037 and $1 trillion by 2047, Shivakumar said.
Among the proposals discussed are nine integrated industrial townships in the BMR. The government has already acquired around 7,900 acres, while acquisition of another 5,600 acres is under way.
The transport blueprint includes expanding Bengaluru’s Metro network by an additional 312 km by 2037, adding 72 km of suburban rail connectivity and developing a proposed 270-km Regional Rapid Transit System linking Bengaluru with Tumakuru, Mysuru and Kolar Gold Fields. A 210-km ring road connecting 10 hubs and a link between the Peripheral Ring Road and NICE Road were also discussed.
The government also plans an AI City modelled on Singapore’s Punggol and is considering an AI university. A phased expansion of BWSSB coverage across Bengaluru Urban district was discussed to strengthen drinking-water and sewage infrastructure.
The BMR is projected to require around 3,600 million litres of water per day by 2037. Plans for treated wastewater reuse and lake rejuvenation are therefore being considered alongside the region’s projected industrial and residential growth.
The plan also envisages 6–6.5 lakh houses, including accommodation for 40,000–50,000 industrial workers.