GHMC authorities speeds up ₹1,090-crore steel flyover corridor project in Hyderabad
The Greater Hyderabad Municipal Corporation (GHMC) has stepped up efforts to expedite the proposed 4.3-km, six-lane bidirectional steel flyover corridor connecting Jubilee Hills Checkpost with NFCL Junction, aimed at easing congestion and enabling smoother traffic movement.

GHMC Commissioner R.V. Karnan, accompanied by Khairatabad Zonal Commissioner B. Santosh and engineering officials, inspected the proposed corridor and reviewed the progress of preparatory works.
During the inspection, the Commissioner directed officials to expedite junction improvements at KBR Park Main Entrance, Agrasen Junction and Jubilee Hills Checkpost to facilitate seamless one-way traffic movement around KBR Park.
He also instructed officials to commence geotechnical investigations immediately along the stretch from Mugdha Junction to NFCL Junction.
Foundation excavation and parallel off-site steel fabrication works between Jubilee Hills Checkpost and Mugdha Junction were also ordered to be accelerated.
The project, estimated to cost ₹1,090 crore, is intended to improve connectivity along the corridor and reduce traffic congestion through signal-free movement.
Officials were instructed to ensure timely execution while minimising inconvenience to commuters and the public during construction.