Nagawara Lake set for major rejuvenation to strengthen Bengaluru’s flood resilience
The Greater Bengaluru Authority (GBA) has taken up a major rejuvenation project at Nagawara Lake, aimed at strengthening Bengaluru’s flood resilience, improving water management and restoring the lake’s ecological health.

The project is being implemented under the National Disaster Mitigation Fund (NDMF) and covers the 89-acre-28-gunta lake and its 46.18 sq km catchment area, which contributes stormwater runoff to the lake.
The rejuvenation plan combines flood-management measures with ecological restoration. Key interventions include scientific desilting, wetland restoration and improvements to inlet and outlet structures to strengthen the lake’s capacity to manage stormwater.
The project also provides for the construction of sedimentation ponds, strengthening of lake bunds, shoreline protection and boundary fencing. A biodiversity island will also be created using earth recovered during the desilting process.
The interventions are designed to improve the functioning of Nagawara Lake as part of Bengaluru’s interconnected network of lakes and stormwater channels. Better stormwater regulation is expected to support flood mitigation, while restoration of wetlands and shoreline areas can contribute to groundwater recharge, improved water quality and greater urban biodiversity.
The project also seeks to strengthen the lake against extreme rainfall events and other climate-related stresses, while protecting its role in the city's broader blue-green infrastructure.
With Bengaluru facing increasing pressure on its lakes, drainage systems and natural water bodies, the Nagawara rejuvenation project represents an integrated approach combining water security, flood management and ecological restoration.
The initiative aims to restore Nagawara Lake as a healthier and more resilient urban ecosystem while strengthening the city's wider natural infrastructure.