NHAI approves two iconic cable-stayed bridges for Amaravati Outer Ring Road
The National Highways Authority of India (NHAI) has reportedly agreed to construct two cable-stayed bridges across the Krishna River as part of the proposed Amaravati Outer Ring Road (ORR) project, following a request by Andhra Pradesh Chief Minister N. Chandrababu Naidu.

The two proposed bridges are planned at the Munnaluru–Muttaipalem and Vallurupalem–Vallabhapuram stretches, with reported lengths of 2.90 km and 5.30 km, respectively. The structures are expected to become prominent engineering features of the proposed expressway.
The Amaravati ORR is planned as a 189.93-km, six-lane expressway, with an estimated project cost of ₹30,491 crore. The road is expected to improve connectivity around the state capital region and strengthen links between Amaravati and surrounding areas.
The proposed cable-stayed bridges across the Krishna River are intended to support the expressway's alignment across the river and improve connectivity between areas on either side.
Cable-stayed bridges use cables connected directly to towers to support the bridge deck. The design is commonly used for major river crossings where long spans are required.
The proposed structures could become important components of the ORR's engineering design, subject to the completion of detailed planning, technical assessments and the necessary approvals.
The ORR is among the major road infrastructure proposals associated with the development of Amaravati as Andhra Pradesh's capital region. A high-capacity ring road could help divert through-traffic away from urban areas, improve access to surrounding towns and facilitate the movement of goods and passengers.
The proposed investment also reflects the broader infrastructure ambitions linked to Amaravati's development.
While the reported NHAI agreement marks a significant development for the project, details regarding final approvals, construction schedules, tendering and implementation are awaited. The reported project cost and bridge lengths should be read as proposed figures until confirmed through official project documentation.