Southern Railway floats tender for 22-km Railway doubling in Thanjavur–Kumbakonam–Mayiladuthurai section
Southern Railway has floated tenders for doubling approximately 22 km of railway track between Aduturai and Sundara Perumal Kovil in the Thanjavur–Kumbakonam–Mayiladuthurai section of Tamil Nadu.

The proposed project includes electrification of the second line, aimed at strengthening rail infrastructure along this important regional corridor.
The construction and electrification work is expected to be completed within 11 to 12 months, according to the details shared.
The project is expected to enhance railway capacity on the section and support smoother train operations.