Tamil Nadu Government to procure 1,000 MW of gas-based power to meet peak demand: CTR Nirmal Kumar
The Tamil Nadu government has decided to procure around 1,000 MW of electricity through gas-based power generation between October 15 and 31 to meet peak-hour demand, Minister CTR Nirmal Kumar said amid a controversy over power cuts in the state.

Responding to concerns over electricity supply, the minister accused the Opposition of spreading misinformation and rumours about the situation. He said the government had called for tenders and that details of the procurement process had been made available.
According to Nirmal Kumar, the proposed power procurement arrangement will operate only during peak-demand hours, from 6 pm to midnight, over the specified period.
The move is intended to help meet electricity demand during the evening peak period, when consumption typically rises.
The minister sought to clarify the government’s position amid the political debate over power availability and alleged outages. He maintained that the government was taking steps to address demand through the planned procurement of additional electricity.
The arrangement is scheduled to run for 17 days, from October 15 to October 31, with gas-based generation being used during the six-hour evening window.
The announcement comes as the Opposition has raised concerns over power supply in Tamil Nadu, prompting the government to defend its handling of electricity demand and explain the measures being taken to maintain supply during peak hours.