Tamil Nadu to build new Secretariat on 25.55 acre in Pattinapakkam
The Tamil Nadu government has formally identified a 25.55-acre site at Foreshore Estate in Pattinapakkam for a new integrated Legislative Assembly and Secretariat complex, bringing Chief Minister C Joseph Vijay’s plan for a modern administrative campus a step closer to implementation.

A government order issued by the Public (Buildings) Department has granted in-principle approval for the project, which is estimated to cost around ₹1,200 crore. The proposed complex is expected to have a built-up area of approximately 20 lakh square feet and will bring the Assembly and government departments under one integrated facility.
The site, comprising land held by the Tamil Nadu Housing Board, Greater Chennai Corporation and the Revenue Department, is located close to the Chief Minister’s current residence in the Foreshore Estate area.
The Public Works Department has been directed to prepare a Detailed Project Report (DPR), including cost estimates, within three months. Three committees will also be constituted to oversee the selection of an architectural consultancy and finalisation of the building’s preliminary and final designs.
Vijay had announced the new complex in the Assembly earlier this month, citing the limitations of the historic Fort St George campus and the need for infrastructure capable of meeting Tamil Nadu’s administrative requirements for decades ahead.
However, the proposed location has already attracted criticism. PMK leader Anbumani Ramadoss has opposed the Pattinapakkam site, citing existing traffic congestion and limited space. He has instead proposed developing a much larger integrated administrative city outside Chennai.
The government’s decision marks a major proposed shift from the historic Fort St George as the state’s administrative centre.